Location: MADAGASCAR
Region: ATSINANANA
Estimated yield: 2 MW
SPECIFICATIONS AND SPECIAL FEATURE
- Plant Capacity: 2 MW
- End of PPA: 2040
- P50 - Yield (kWh/year): 1,633
- P50 - Energy Produced (MWh/year): 780
CONTEXT AND OBJECTIVES
As part of the Government of Madagascar’s efforts to grant cheaper and cleaner access to electricity to the population, they have requested the hybridization of existing HFO plants.
Three solar plants were built at Diego, Mahajanga and Toamasina to contribute to that effort.
PARTNER
LIDERA GREEN POWER PCC
PLANNING
Construction has been completed in 2020 and the site is in operation. Since its commission, an extension has been under construction and should be commissioned by Q3 2021. The extension will consist of a field of PV panels that will add 18MW to the energy yield for a total of 20MW produced on site.